Controlled packaging
Waste is contained, sealed and identified using methods appropriate to the material and project.
ASBESTOS REMOVALCONSULTANTS LTDControlled to final disposal
06Safe removal is not complete until asbestos waste has been packaged, transported and disposed of correctly.
Ask A1 about this serviceWhy it matters
Waste is contained, sealed and identified using methods appropriate to the material and project.
Routes, handling and loading are planned to prevent breakage, fibre release and uncontrolled access.
Transport arrangements are coordinated to meet applicable controls and protect workers and the public.
Asbestos waste is taken to a facility authorised to receive it, with project records maintained for accountability.
The A1 approach
Estimate waste, select packaging and confirm the disposal route before removal.
Package waste safely within the controlled work process.
Manage loading, vehicle controls and documentation.
Complete disposal at an authorised facility and retain the relevant records.
Illegal dumping or incorrect disposal can endanger workers, the public and the environment. Waste must be managed as carefully as the removal itself.
Speak with A1
We will help you understand the risk, the required controls and the safest next step.